The working parties are well under way along the Glen – and more ‘things to do’ are being spotted.

As John McGregor points out: “We need to replace the damaged sign by the entrance from Manor Road:”

Meanwhile, John has been in touch with EDDC’s Streetscene: they have restored most of the fencing along the Glen:

February 2022, fencing – Friends of Glen Goyle 

But there are some areas where a little more work needs doing:

“At the top entrance to the Glen from Glen Road there is some faulty fencing. It is by the small signs indicating the Sidmouth Ring walk: it would be good to see replacement fencing erected. Additionally there is a hole in the tarmac which needs filling.”